給分布式光伏做好防水需要注意哪些?

Data:2023-02-21

目前國家以及地方政府都有出臺鼓勵新能源的發(fā)展冬念,在光伏領(lǐng)域趁窃,分布式光伏支架系統(tǒng)的身影在越來越多地方出現(xiàn),成為備受青睞的太陽能支架系統(tǒng)解決方案之一急前。
At present, the national and local governments have issued policies to encourage the development of new energy. In the solar field, residential and industrial solar mounting systems have emerged in more and more places, and become one of the most popular solar mounting system solutions.
 
下面我們來探討下分布式光伏里屋面防水的問題
Now let's discuss the problem of roof waterproofing in distributed solar
 
屋面防水處理的原則一般是通過導(dǎo)水槽達到排水的目的醒陆,即保證節(jié)點處理在暴雨積水時能順利的讓水瀉掉而保障屋面不漏。對于必須打孔破壞原屋面的情況裆针,則要做到因地制宜刨摩,根據(jù)不同情況做不同處理寺晌,下面我們來具體分析下。
The principle of roof waterproof treatment is generally to achieve the purpose of drainage through the guide channel, that is, to ensure that the node treatment can smoothly let the water flow out and ensure that the roof does not leak when the storm water is accumulated. For the case that the original roof must be damaged by drilling, it is necessary to adjust measures to local conditions and make different treatment according to different conditions. Let's analyze it in detail.
 
混凝土平屋面光伏支架系統(tǒng)防水(Waterproofing of concrete flat roof solar mounting system

給分布式光伏做好防水需要注意哪些澡刹?

 
對于新建造的建筑,通常在設(shè)計建筑的時候就按照常規(guī)做法像屋,預(yù)埋螺栓怕犁,做好屋面防水。而對于已經(jīng)建造完成的建筑己莺,在設(shè)置太陽能組件基座時奏甫,防水層應(yīng)鋪設(shè)到基座和金屬埋件的上部,并在地腳螺栓周圍做密封處理凌受,穿防水層處用防水密封膠填實阵子,另外可以在基座下增設(shè)附加防水層,這樣即使基座頂部發(fā)生滲漏胜蛉,雨水也不會到達結(jié)構(gòu)層挠进。
For newly built buildings, bolts are usually embedded and roof waterproofing is done according to the conventional practice when designing buildings. For the buildings that have been built, when setting the solar module base, the waterproof layer should be laid on the upper part of the base and the metal embedded parts, and the sealing treatment should be done around the anchor bolts. The waterproof layer should be filled with waterproof sealant. In addition, an additional waterproof layer can be added under the base, so that even if there is leakage at the top of the base, the rain will not reach the structural layer.

化學(xué)錨固螺栓光伏支架系統(tǒng)防水(Chemical anchor bolt solar mounting system waterproof)
 
對于混凝土平屋面的已有建筑,若使用化學(xué)錨固螺栓固定支架誊册,應(yīng)首先確認保護層或使用面層的厚度领突。對于單位面積承重較大的預(yù)制樓板屋面,可在屋面現(xiàn)澆一定厚度的混凝土層案怯,固化后利用化學(xué)錨固螺栓固定支架君旦。
For existing buildings with concrete flat roof, if chemical anchor bolts are used to fix the mounting, the thickness of the protective layer or the surface layer used shall be confirmed first. For the prefabricated floor roof with large bearing capacity per unit area, a certain thickness of concrete layer can be cast in place on the roof, and the mounting can be fixed with chemical anchor bolts after curing.
 
對于上覆瓦片的坡屋面,應(yīng)確認打孔深度嘲碱,將化學(xué)錨固螺栓固定后金砍,螺栓穿過瓦片的位置應(yīng)使用防水密封膠做良好處理÷缶猓化學(xué)錨固螺栓具有承載能力大恕稠,抗疲勞、耐老化等優(yōu)勢扶欣,對基體無膨脹力鹅巍,不產(chǎn)生擠壓應(yīng)力,因此宵蛀,不會對屋面防水造成不良影響昆著。
For the sloping roof covered with tiles, confirm the drilling depth. After fixing the chemical anchor bolt, the position where the bolt passes through the tiles shall be well treated with waterproof sealant. The chemical anchor bolt has the advantages of large bearing capacity, fatigue resistance and aging resistance, and has no expansion force on the base and no extrusion stress. Therefore, it will not cause adverse impact on roof waterproofing.
 
金屬屋面光伏支架系統(tǒng)防水(Waterproofing of metal roof solar mounting system)

給分布式光伏做好防水需要注意哪些?

 
對于金屬屋面來說凑懂,需要將光伏系統(tǒng)的鋼結(jié)構(gòu)穿透原防水層及壓型鋼板,固定在建筑的主體鋼結(jié)構(gòu)上;再參照金屬屋面防水做法梧宫,進行隔汽接谨、保溫及防水處理摆碉。施工的重點是去銹蝕、密封脓豪、對基層及外圍涂刷防水涂料巷帝。
For the metal roof, the steel structure of the solar system needs to penetrate the original waterproof layer and profiled steel plate and be fixed on the main steel structure of the building; Then, steam insulation, thermal insulation and waterproof treatment shall be carried out with reference to the waterproof method of metal roof. The key points of construction are rust removal, sealing, and waterproof coating on the base and periphery.
 
對金屬屋面的局部漏點,應(yīng)采用優(yōu)質(zhì)中性耐候密封膠涂抹封堵;對于局部銹蝕嚴重的彩鋼板扫夜,在安裝光伏組件前需要更換楞泼。
Local leakage points of metal roof shall be sealed with high-quality neutral weatherproof sealant; The color steel plate with serious local corrosion needs to be replaced before installing the PV module.
 
因此,光伏支架系統(tǒng)的安裝設(shè)計不僅要考慮日照和陰影笤闯,承重堕阔、排水、防水等細節(jié)同樣值得被關(guān)注颗味。晨科已經(jīng)為全球100多個國家的用戶解決光伏支架系統(tǒng)難題超陆,去過雪地,也去過高山浦马,還有湖泊農(nóng)田时呀,如果你不知道如何選擇一套合適的太陽能支架解決方案請聯(lián)系我們!
Therefore, the installation design of solar mounting system should not only consider sunlight and shadow, but also pay attention to the details of load bearing, drainage and waterproof. Chiko has solved the problem of solar mounting system for users in more than 100 countries around the world, and has been to snow, mountains, lakes and farmland. If you don't know how to choose a suitable solar mounting solution, please contact us!



上海晨科太陽能科技有限公司           地址:上海市嘉定區(qū)興文路680號
郵箱:chiko@chikolar.com               電話:+86-21-59972267
網(wǎng)站:www.zh8833.com                     傳真:+86-21-59972938


線上下單
聯(lián)系我們
日韩在线字幕AV在观看,日韩黄中字午夜Av,午夜久久精品国产亚洲Av,日韩AV电影中字幕天堂网